Upcoming hearings

2 cases on the calendar, plus 0 heard but still awaiting a decision and 0 filed or continued and waiting for a hearing date.

2 pending cases

Scheduled

Wednesday, January 27, 20271 case
12345 E ROOSEVELT BLVDZP-2026-008544
ZBA Permit Denial - Variance · Parkwood Area Civic Association

Permit for the erection of a three-story addition onto an existing detached structure. For site improvements that include landscaping, athletic amenities (basketball courts), a new surface parking lot, and the expansion of the existing parking lot for a grand total of 613 vehicle parking spaces. (See plans for the number and location of all accessible, preferential, and loading spaces). No change to the previously approved Educational Facility and Active Recreation uses. See ZP-2023-003449, MI-2023-006405 Granted 2/7/2024: FOR ERECTING AN ATHLETIC FIELD WITH BLEACHERS, SCOREBOARD AND A ONE STORY ACCESSORY DETACHED STRUCTURE AND NO CHANGES TO THE EXISTING STRUCTURES ON THE SAME LOT. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLAN. FOR THE PROPOSED USE ACTIVE RECREATION AND EXISTING USE EDUCATIONAL FACILITIES, PERSONAL SERVICES (GYMNASIUM) AND ACCESSORY OFFICE AND EXISTING 476 ACCESSORY PARKING SPACES INCLUDING ADA SPACES AS PREVIOUSLY APPROVED. See AP# 1055711, MI-2020-001183 Granted 10/28/2020 FOR THE ERECTION OF ONE (1) DETACHED STRUCTURE ( GYMNASIUM ); REDUCING THE CANOPY AREA; THE OPEN AREA AND FLOOR AREA RATIO CHANGED AS PER PROVISO PLANS. ON THE SAME LOT EXISTING THREE(3) STORY STRUCTURE REMAINS . THE SIZE AND LOCATION AS PER ZBA STAMPED PLANS. FOR A PERSONAL SERVICE( GYMNASIUM )( 163 SEATS) ON THE SAME LOT EXISTING EDUCATIONAL FACILITY IN PARTIAL BASEMENT , PARTIAL FIRST FLOOR, PARTIAL SECOND FLOOR AND ENTIRE THIRD(3RD) FLOOR AT SPACE# 1; EXISTING BUSINESS AND PROFESSIONAL OFFICE ON PARTIAL FIRST(1ST) AND SECOND(2ND) FLOORS IN AN EXISTING DETACHED STRUCTURE WITH ACCESSORY PARKING SPACES ( FOUR HUNDRED AND SEVENTY-NINE(479) PARKING SPACES INCLUDING WITH SEVEN(7) ACCESSIBLE SPACES AND WITH TWO(2) VAN ACCESSIBLE SPACES) ON THE SAME LOT WITH ALL OTHER USES INCLUDING WITH SIGNAGE AS PREVIOUSLY APPROVED.

ZBA Watch tracks the Zoning Board of Adjustment because housing supply is Build Philly Now's subject — choosing to measure wait times, unit counts, and case volume is itself a point of view. Cases are scoped to appeal numbers starting "ZP-", 2020–present; earlier ZBA cases are planned but not yet loaded. Approvals and denials are rendered the same way — this site aggregates and monitors, it does not score outcomes as good or bad.

Source: City of Philadelphia Department of Licenses & Inspections via CARTO. Data updates periodically and may not reflect the most recent hearings or decisions.

Upcoming ZBA Hearings | ZBA Watch